|
Interservice
Procedures for Instructional Systems Development :
Executive Summary and Model (Continued...)
by Robert K. Branson, Gail T. Rayner and J. Lamarr Cox
BLOCK I.3:
CONSTRUCT PERFORMANCE MEASURES
Introduction
A third critical function in the ISD process is the construction
of Job Performance Measures (JPMs) for each of the tasks selected
for training. Job Performance Measures may be combined to make up
the tests which tell whether or how well a person can perform a
job.
Each task selected for training must have an associated JPM
which is the best available indicator of performance. Job Performance
Measures are used to determine job proficiency, design and evaluate
training, and maintain quality control. They are used by unit commanders,
the personnel system, and by the training system when there is a
need to measure job performance or to design or evaluate training.
Rationale
Recent developments, arising out of the management of the military
system, and decisions by the United States Supreme Court have made
it mandatory that Job Performance Measures of the highest possible
technical quality be developed for each job in the service. In addition
to the obvious direct benefits to military training and operations,
good JPMs can eliminate unnecessarily restrictive standards in many
DOSs and, at the same time, eliminate charges of real or apparent
discrimination in job assignments.
The development of JPMs is a highly technical professional area
in which one finds many measurement specialists. From time to time
it will be necessary to obtain inputs from these specialists in
order to insure the quality and utility of the JPMs.
continued...
Page 26 of 130  
|